Juniper-networks ERX-1410 Manual do Utilizador Página 96

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 95
CHAPTER 7
Maintaining the ERX System
7-4
6 When this SRP module is available, synchronize the SRP modules.
host1#synchronize
7 When the SRP modules are synchronized, reboot the SRP module
that you upgraded.
host1#reload slot 6
8 When this SRP module is available, synchronize the SRP modules.
host1#synchronize
9 When the SRP modules are synchronized, force the redundant SRP
module to take over from the primary SRP module.
host1#srp switch
10 Immediately remove the former primary SRP module.
11 Repeat steps 48 for the former primary SRP module.
Replacing an NVS Card
To replace an NVS card on an SRP module:
1 Obtain an antistatic container for the NVS card you will remove (see
Storing Modules and Components, earlier in this chapter).
2 With a small flathead screwdriver, remove the faceplate from the
NVS card slot on the SRP module (see Figure 7-1).
3 Use the screwdriver to depress the button next to the NVS card (see
Figure 7-1).
This action releases the NVS card.
Vista de página 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 183 184

Comentários a estes Manuais

Sem comentários